Detailed Description: | Good day. this is to request your best offer for the following scope of works for the Transmission Line portion of our Carmen Copper Project.. Scope: 1. Design of Foundation, Structural & Electrical for Sigpit-Carcon 34.5kV Transmission Line including preparation of Bill of Materials 2. Supply of Steel Structures and T/L materials and accessories Project site: Carmen Copper Corp., Toledo City, Cebu Target completion (energization): March 30, 2012 Please consider site condition. For instance, our requirements for Cebu region the steel structures were based on 0.4G seismic acceleration factor with a maximum design of 240kph wind velocity. Also the conductor to be use would be for 636 MCM ACSR. |
![]() |
|